| |

|
The
kit is made up of 3 main components
1. Top unit (comprising a top fixing & cable holder)
2. 4m cable with soldered ends
3. Base unit (comprising a base fixing, tensioner & a cable
holder)
Fit four connectors (X9000S)
onto one of the the acrylic
holders
Measure the distance between the cable centers.
Having decided where the showcard holders are to be sited in your
space, mark on the ceiling the appropriate positions for the top of the
cables. Screw the top fixings into the ceiling and screw on the cable
holders. Using a plumb line make corresponding marks on the floor and
screw the base fixing to the floor.
Taking the total measurement from ceiling to floor LESS 20/25mm, cut
the cable. Push the CUT end into the top cable holder and the soldered
end into the bottom cable holder. Using the tensioner attach the bottom
cable holder to the base fixing and tension the cable.
Attach showcard holders as required.
|